Thursday, October 30, 2014

Garage footings

Trenches for the garage footings have been dug.
 The garage will house three cars with two doors.  This is the 2-door section of the garage and is deeper than the single car area.

 Here's the single car area.  You can see the front goes in so it's not as deep.  There will also be a garage door on the back of the house since there isn't much room on the sides of the house in case we need to get something large back there.

 Another shot of how the garage narrows.  I'm not sure how the garage will be constructed considering the final grade will need to come up a foot.  I believe the top of the ICF block shown in this picture is at final grade.
Here's the whole trench.  You can see the back wall trench too and the rebar that will be set in the foundation.