No real progress to report on this week. We've finished cleaning the house in preparation for the window delivery on the 7th. Mike says that the windows will be set on the 9th so I should have some nice pictures for the next update. I'm not sure they can complete the whole house in one day so all the windows might not be completed for the next update, but it will at least be started.
The final draw with Ken has been submitted and we should be wrapping up this stage of the bank stuff soon. Hopefully the vendors will be paid soon and we'll get a little out-of-pocket expenses back, which will go right into the house for the copper roof or the window setting labor. We need to finalize our design intentions for the gazebo fireplace and maybe get in contact with California Closets to come up with a design for the master closet. We could even use them for the pantry, garage, and craft area in the laundry room since it seems like they do all that too.
Mike should be getting his estimate to us soon since most of the major decisions have been made. I think the only remaining budget item was the electrical installation, which needed to be calculated from the lighting plan we came up with last week.
Some times things move fast, and some times things move slow, but at least things are moving forward.
No comments:
Post a Comment